MDX PROJECT No.: 83605
OWNER:

Miami Dade Expressway Authority (MDX)
3790 N.W. 21st Street
Miami, Fl 33142
(305) 637-3277

OWNER’S REP:           

Dade Transportation Consultants, Inc.

GENERAL CONTRACTOR:
Community Asphalt Corporation
SUBCONTRACT AMOUNT:

$43,714,093.00

CONTRACT TIME: 
1199 Days
 
GENERAL DESCRIPTION

The general contract requires the complete design and construction of the SR 836 “Dolphin Expressway” from NW 107th Avenue to NW 137th Avenue Including construction of NW 137th Avenue from SW 8th Street to NW 12th Street, Miami Dade County. Condotte’s subcontract scope of work in this project consists on the construction of nine vehicular bridges, the widening and replacement of traffic railing barrier at two existing bridges over NW 107th Avenue (bridges 14 & 15), ten MSE retaining walls and three Sound Walls.  Bridges 1, 2, 3, 6, 7, 8,  & 9 are comprised of steel longitudinal box girders; steel cross girders, and flair and circular concrete columns on spread footings. Bridge 13, which spans NW 107th Avenue, consists of precast Florida U-Beams, caps, columns and spread footings. The Bridge at SW 137th Avenue over Tamiami canal consists of a flat slab bridge, caps, and 18” prestressed concrete piles foundation.  The Sound Walls consist of a system of precast components assembled over a 30-inch diameter auger cast piles foundation. Temporary components to the project include support of embankments with sheet piles and soil anchors.

 

MAJOR CONSTRUCTION COMPONENTS
Volume of Concrete
15,240 CY
Reinforcing Steel
3,817,690 LB
Prestressed Concrete U-Beams
1,008 LF
Embankment at MSE Walls
25,883 CY 
Structural Steel Girders
15,323,833 LB
Sound Walls
190,316 SF
MSE Walls
34,875 SF
18” prestressed concrete piles
2,290 LF
 
Completion:  January, 2007