| Volume of Bridge Concrete |
2,474 |
CY |
| MSE Retaining Wall |
31,260 |
SF |
| Reinforcing Steel |
561,816 |
LB |
| Concrete Prestressed Beams |
3,034 |
LF |
| Excavation |
28,700 |
CY |
| Embankment |
33,681 |
CY |
| Concrete Pavement |
20,903 |
SY |
| Asphalt Pavement |
1,806 |
TN |
| Drainage Pipe |
2,321 |
LF |
| Lime Rock Base Pavement |
2,800 |
SY |
|