DESIGN-BUILD MDX PROJECT No.: 112-004
OWNER:

Miami Dade Expressway Authority
3790 N.W. 21st Street
Miami, Fl 33142
(305) 637-3277

OWNERS REP:

EarthTech Global Transportation

GENERAL CONTRACTOR:

Community Asphalt Corporation
14005 N.W. 186th Street
Hialeah, Florida  33018
(305) 829-0700

SUBCONTRACT AMOUNT:

$3,657,353.00
   
GENERAL DESCRIPTION

This design-build project consists of the widening of two existing bridges totaling over 500’ in length.  One bridge includes structural steel girders, drilled shaft installation, 18” and 30” Pile driving, and deck placement.  The other bridge consists of 18” pile installation, footing/column construction, and prestressed AASHTO Type III/Modified Type III girders.  The project is comprised of two MOT phases in which both bridges are constructed simultaneously.

 

MAJOR CONSTRUCTION COMPONENTS

Volume of Concrete:

1225 CY

Prestressed Concrete Girders

625 LF

Structural Steel Girders

240,000 LB

Reinforcing Steel

300,000 LB

Completion:  December 2003