FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE STREET
TALLAHASSEE, FLORIDA 32399-0450
Mr. Jim McLaughlin
Phone: (800) 749-2967
CONTRACT NO.:
72160-3505
CONTRACT AMOUNT:
$48,236,625.00
GENERAL DESCRIPTION
The structure is a dual concrete segmental, continuously post-tensioned box girder bridge over the St. John's River. The method of construction was cast-in-place, balanced-cantilever with a center span of 630 feet in length. The structure has a clear height of 75 feet above the river. Each bridge carries 3 lanes of traffic, together with a lane for a future automated tram or people mover.