JACKSONVILLE, FLORIDA
OWNER:
FLORIDA DEPARTMENT OF TRANSPORTATION
605 SUWANNEE STREET
TALLAHASSEE, FLORIDA 32399-0450
Mr. Jim McLaughlin
Phone: (800) 749-2967
CONTRACT NO.:

72160-3505

CONTRACT AMOUNT:

$48,236,625.00

 
GENERAL DESCRIPTION

The structure is a dual concrete segmental, continuously post-tensioned box girder bridge over the St. John's River.  The method of construction was cast-in-place, balanced-cantilever with a center span of 630 feet in length. The structure has a clear height of 75 feet above the river. Each bridge carries 3 lanes of traffic, together with a lane for a future automated tram or people mover.

 
MAJOR CONSTRUCTION COMPONENTS

No. of Carriageways

2 Ea.

Width of Carriageways

75’-8”

Volume of Concrete

57,000 Cu.Yd.

Pre-stressing Tendons

2,885,704 Lb.

Drill Shafts Diameter

5 Ft.

Length of Carriageways
1,645 Ft.
No. of Spans
5 Ea.
Reinforcing Steel
6,427,343 Lb.
Drill Shaft Foundations
464 Ea.
Total Length – Drill Shafts
14,088 LF
 

Completion Date:   October 1994