GENERAL DESCRIPTION
The Design-Build-Finance Team is to improve reconstruction of the SR826/Flagler Street and SR836/NW 72nd Avenue Interchanges. The improvements along SR826 at SR836 Interchange. All existing bridges between the limits of the project are to be replaced, except the SR836 mainline bridges over the CSX/FEC railroad bridges, and the widening of the existing SR836 eastbound to the exit ramp to NW 57th Ave. The project also includes new drainage, lighting, ITS, signalization and signing and pavement marking improvements.
 
MAJOR CONSTRUCTION COMPONENTS
Volume of Bridge Concrete

87,362 CY
MSE Retaining Wall

768,000 SF
Reinforcing Steel
17,104,118 LB
Structural Steel Beams
7,400,000 LB
Excavation
1,445,000 CY
Embankment
3,842,600 CY
Milling Existing Asphalt
154,000 SY
Asphalt Pavement
180,000 TN
Drainage Pipe
84,000 LF
Limerock Base Pavement
740,000 SY
 

Start Date: November 2009 - Completion Date: November 2014