The Design-Build-Finance Team is to improve reconstruction of the SR826/Flagler Street and SR836/NW 72nd Avenue Interchanges. The improvements along SR826 at SR836 Interchange. All existing bridges between the limits of the project are to be replaced, except the SR836 mainline bridges over the CSX/FEC railroad bridges, and the widening of the existing SR836 eastbound to the exit ramp to NW 57th Ave. The project also includes new drainage, lighting, ITS, signalization and signing and pavement marking improvements. |