OWNER:

Florida Dept. of Transportation
1000 N.W. 111th Avenue
Miami, FL 33172
Attn: Dari Vorce
(305) 499-2392

CONTRACTOR:         
Condotte-de Moya JV, LLC
FDOT Contract No:
E-6E59
CONTRACT AMOUNT:
$177,205,569.78
Engineer of Records:
BCC Engineering, Inc.
Contact: Mr. Ariel Millan, P.E.
305-670-2350
T.Y. Lin International
Contact: Mr. Mariano Valle, P.E.
305-567-1888
   
GENERAL DESCRIPTION
This is a design/build/finance project for the Florida Department of Transportation District VI. The work consists of the addition of one general use lane in each direction; auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements along the SR826 mainline and ramps. The interchanges that will be improved with this project are the SR826 interchanges at SW 56 Street/Miller Drive, SR874/Don Shula Expressway and SW 40 Street/Bird Road. Four of the bridges are over the CSX railroad and are comprised of steel girders. The other interchange bridges are designed with concrete beams (AASHTO Type IV, Mod. Bulb Tee, Florida I Beams). This project also includes a new pedestrian bridge, new drainage, lighting, landscaping improvements, ITS and signalization improvements.
 
MAJOR CONSTRUCTION COMPONENTS
Volume of Bridge Concrete

13,600 CY
MSE Retaining Wall

375,000 SF
Rip Rap (Rubble)

500 TN

Reinforcing Steel
2,720,000 LB
Structural Steel Beams
5,776,000 LB
Excavation
108,000 CY
Embankment
606,000 CY
Milling Existing Asphalt
98,000 SY
Asphalt Pavement
106,000 TN
Drainage Pipe
50,500 LF
Limerock Base Pavement
370,000 SY
 

Completion Date: June 2012