This project includes construction of 4 bridges, retaining walls, roadway widening, embankments, asphalt paving, road signs, landscaping. Total project length is 2,445 meters. Construction performed under existing, heavy traffic conditions.
Bridge #1: SR 826 (Palmetto Expressway) over NW 103 Street; total length 70.77 meters, 2 spans
Bridge #2: SR 826 SB Ramp B and NB Ramp B over Little River Canal; total length 25.91 meters,
1 span.
Bridge #3: Ramp D Overpass SR 826; total length 418.35 meters, 11 spans
Bridge #4: SR 826 over W 60 Street; total length 32.31, 1 span. |